A brand in Brooklyn paid a tooling charge on a 900 dollar mould for a pendant, then asked to move the design to a second factory and found the mould was not theirs.
Tooling ownership is the least read clause in a jewelry OEM agreement and the most expensive one to discover late. A mould, a master model and a rubber are three different objects with three different owners by default.
[1]The three tooling objects
The chain of objects
A master model is the original carving that a mould is cut from. A production mould is the rubber or the metal tool that produces the wax. A master rubber is the reference that re-cuts a worn mould.
A factory that holds the master model controls the design even if the brand paid for the mould, because a worn mould can only be remade from a model. That is the trap, and it is written into the default rather than into the contract.
| Object | Typical cost | Default owner |
|---|---|---|
| Master model | 180-400 USD | Factory |
| Production mould | 300-900 USD | Factory |
| Master rubber | 120-300 USD | Factory |
The table is the range we quote, and the default column is what a purchase order without a tooling clause produces. A brand that wants the design should own all three or none of the cost.

[2]The clause that transfers ownership
The four sentences
Four sentences: the tooling is paid by the brand, the brand owns the tooling, the factory stores it at no charge for a stated period, and the factory releases it on request within a stated time.
A clause without the storage period is a clause that produces a storage invoice three years later, and a clause without the release time is a clause that produces a delay at the moment a brand needs to move.
[3]What a brand should actually buy
A brand that intends to stay with one factory should buy nothing and pay a tooling charge as a fee. A brand that intends to move should buy the master model and the master rubber, and treat the production mould as a consumable that the next factory will re-cut.
That split is cheaper than buying all three and it covers the object that actually controls the design.
[4]The mould that wears
A rubber mould produces 2,000 to 4,000 waxes before the detail softens, and a worn mould delivers a softer crest rather than a missing one. The wear is progressive and it is invisible on a single piece.
A brand should record the mould's age and re-cut from the master rubber at the interval rather than when the crest looks soft, because the softness appears after the customer has seen the earlier pieces.
[5]What a transfer costs
A transfer of a master model and a master rubber is a shipment rather than a negotiation, and the cost is the freight plus the new factory's re-cut. A transfer of a production mould includes the tool's condition, which a new factory will inspect and may reject.
A brand planning a move should transfer the model rather than the mould, because the model is the design and the mould is the machine.
[6]What we do
We quote tooling as a line item, state ownership in the purchase order, store tooling free for three years and release it within ten working days on request. Brands that want the design own the master model and the master rubber by default in our quotes.
Minimum order is 50 pieces per design and sizes can be mixed. Sample lead time is around 20 days from approved CAD, bulk 25 to 30 days, and stock designs ship in 15 to 20 days under 500 pieces. Payment is a 30 percent deposit with the balance before shipment, by T/T, PayPal or Western Union.
[7]The charge that is not a purchase
A tooling charge is a fee for the work of cutting, and it is not a sale of the object. A brand that pays 900 dollars for a mould has paid for the labour and not for the rubber, which is a distinction that survives in court and not in a conversation.
The clause should therefore say paid for the tooling and owns the tooling rather than a charge for tooling, because the second wording describes a service and the first describes an asset.
A brand that has already paid a charge without the wording can still buy the master model, which is the object that matters, and the purchase is usually cheaper than the dispute.
[8]The factory that stores for free
Free storage for three years is a concession that most factories will make in a quote and none will make after the order, because it is a line that costs nothing at the start and something later.
A brand should write the period into the purchase order rather than accept a verbal assurance, because a verbal period ends when the salesperson changes employer.
A release time matters as much as the storage period, and ten working days is the number we hold.
[9]The design that is re-cut
A new factory re-cutting from a master rubber will produce a piece that matches the model within 0.1 mm, which is inside the tolerance a customer can see. A re-cut from a photograph will not.
That is why the model is the transferable asset and the photograph is not, and why a brand that owns only images owns a reference rather than a design.
[10]The audit that finds the gap
A tooling audit is a list of every design with the owner, the storage location and the age of the mould. A brand with ten designs can build it in an afternoon and it prevents the surprise at a transfer.
The age of the mould is the column that gets skipped and it is the one that predicts a soft crest six months before the customer notices.
[11]The CAD that should travel with the tooling
A CAD file is not a tooling object and it is the object that a new factory needs to re-cut. A transfer without the CAD is a transfer of a physical model and a guess about the metal.
A brand should require the CAD in a neutral format as part of the tooling package, because a proprietary format is a lock that outlasts the tooling clause.
[12]The sample that proves the transfer
A transferred design is proven by one sample from the new factory compared to the original golden sample. Two pieces on one bench table settle the question in ten minutes.
Without the golden sample the comparison is a memory, and a memory is not a specification.
[13]The metal allowance that changes the weight
A re-cut mould at a new factory may use a different metal allowance, which changes the finished weight by 0.3 g on a 9 g ring. That change moves the piece from normal to light on the hand.
The transfer should include the finished weight per size, because the weight is the part of the design that a customer feels and the part that a re-cut most easily changes.
[14]What a brand should keep in house
A brand should keep the CAD, the golden sample and the weight record. The three together are a design, and a factory that has them can re-cut; a brand that has them can move.
Everything else is an operational detail that a factory manages better than a brand does.
[15]The tooling that outlives the design
A tooling set often outlives the design it was cut for, and a brand that discontinues a piece should decide whether to store the tooling or scrap it. Storage is cheap and scrapping is final.
A brand that may revive a design keeps the master model and the CAD, which together are enough to re-cut without the production mould.
[16]Frequently Asked Questions
Who owns a mold a brand paid for?
The factory, unless the purchase order says otherwise. Payment for a mould does not by itself transfer ownership.
What should a brand buy to control a design?
The master model and the master rubber. The production mould can be re-cut by any factory from those two.
How long does a rubber mold last?
2,000 to 4,000 waxes, and the wear shows as a softer detail rather than a missing one.
Can tooling be moved to another factory?
Yes with a clause that states storage and release. Without it the factory can hold the tooling indefinitely.
[17]Next step
Send the design and the volume, and we will quote tooling with the ownership clause in the same document. See OEM work in the archive, read the journal on sample approval, or open a brief on the contact page.